Lean redesign that cut waste, cost and frustration.
Case study
Renal service transformation
We carried out a detailed analysis of the current state and designed a future state lean process that reduced waste, reduced the cost of tests, and increased both patient and staff satisfaction.
£2.5m
Savings plan over 3 years
What we delivered
Detailed current-state analysis of the renal pathway